DEMO // MBSE REVIEWS / SCCB // INTERNAL-DEMO
MBSE REVIEWS / SCCB

Software Product Evaluation & Change Control

The end-to-end review workflow for software product evaluations (SPER) feeding the Software Change Configuration Board (SCCB). Every status transition demands specific MBSE artifacts before the item advances.

Workflow

SPER → SCCB State Machine

⟦ SysML Snippet — Submitted → Triage → Technical → Security → V&V → SCCB → Approved/Rejected/Deferred
Tracker

Active Reviews

SPER-2041 · EW / MDF
Threat library schema v3 — emitter polarization field
OWNER: USRL / EW · REQS: SRS-EW-0214, IRS-MDF-0031 · RISK: HM
SCCB
Required artifacts at this state
  • Cross-domain impact memo
  • Cost / schedule estimate
  • Risk + mitigation
  • Baseline branch plan
SPER-2058 · Datalink
MADL time-slot allocator — 4-ship deconfliction
OWNER: Datalink Planner · REQS: SRS-DC-0044, SRS-DC-0061 · RISK: ML
V&V Review
Required artifacts at this state
  • Verify matrix delta
  • Regression test plan
  • SIL/HWIL results
  • Trace coverage report
SPER-2067 · Ground Security
DTC sanitize on offload — multi-pass policy
OWNER: ISSE · REQS: SRS-GS-0018 · RISK: HM
Security Review
Required artifacts at this state
  • NIST 800-53 control delta
  • Classification impact (TFCS)
  • Crypto / key impact
  • ATO POA&M update
SPER-2071 · ALIS / Coalition
ALIS/ODIN releasability filter — FMS partner X
OWNER: Coalition Gateway · REQS: SRS-CR-0007, IRS-AO-0022 · RISK: MM
Technical Review
Required artifacts at this state
  • Updated BDD/IBD diff
  • Updated Sequence/Activity diff
  • Static analysis report
  • Peer review record
SPER-2078 · Weapons
Weapon EZ recalc — SDB-II energy model update
OWNER: Weapon Planner · REQS: SRS-SW-0061 · RISK: ML
Triage
Required artifacts at this state
  • Impact Pre-Assessment
  • Domain Routing
  • Priority / Severity
SPER-2080 · Crypto
Crypto key rollover scheduler — leap-second fix
OWNER: Crypto Planner · REQS: SRS-CR-0019 · RISK: LL
Submitted
Required artifacts at this state
  • SPER Form
  • Change Description
  • Linked Requirement IDs
SPER-2014 · Debrief
Debrief reconstruction — ADR ingest schema 2.1
OWNER: Debrief · REQS: SRS-DB-0008 · RISK: LL
Approved
Required artifacts at this state
  • SCCB minutes
  • Baseline tag (Teamwork Cloud)
  • Release notes draft
Reference

Artifacts required at every state

Submitted
  • SPER Form
  • Change Description
  • Linked Requirement IDs
Triage
  • Impact Pre-Assessment
  • Domain Routing
  • Priority / Severity
Technical Review
  • Updated BDD/IBD diff
  • Updated Sequence/Activity diff
  • Static analysis report
  • Peer review record
Security Review
  • NIST 800-53 control delta
  • Classification impact (TFCS)
  • Crypto / key impact
  • ATO POA&M update
V&V Review
  • Verify matrix delta
  • Regression test plan
  • SIL/HWIL results
  • Trace coverage report
SCCB
  • Cross-domain impact memo
  • Cost / schedule estimate
  • Risk + mitigation
  • Baseline branch plan
Approved
  • SCCB minutes
  • Baseline tag (Teamwork Cloud)
  • Release notes draft
Rejected
  • Rejection rationale
  • Linked alternative SPER
Deferred
  • Deferral rationale
  • Re-review trigger / date