DEMO // DEBRIEF · POST // INTERNAL-DEMO
DEBRIEF · POST

Post-Mission Debrief — MSN 24-1147

Execution scorecard, BDA, ALIS PHM downlink, and lessons learned. All metrics and BDA outcomes are fictional and built only for MBSE / mission-thread illustration.

◤ EXECUTION SCORECARD
MetricResultStatus
TOT accuracy+04 secGREEN
BDA primary tgt2 of 2 TEL destroyedGREEN
BDA secondary tgtEW radar mission-killGREEN
A/R efficiency14.2K offload vs 14.0K plannedGREEN
EMCON discipline1 inadvertent Link-16 TX @ WP-03AMBER
Fuel reserve2.1K lb (planned 2.4K)AMBER
Weapon malfunctionST3 SDB #2 INS drift (CEP 18 m)AMBER
◤ BATTLE DAMAGE ASSESSMENT
TargetOutcomeWeaponEvidence
BRAVO-3 SA-21 TEL #1DestroyedGBU-39/B SDBEOTS imagery 0548:02Z
BRAVO-3 SA-21 TEL #2DestroyedGBU-39/B SDBEOTS imagery 0548:14Z
BRAVO-7 P-18 EW rdrMission-killAGM-158C LRASMMAGIC 11 SIGINT silence
BRAVO-3 Big Bird rdrFunctionalRe-attack tasked Day-2
◤ ALIS / ODIN PHM DOWNLINK
SystemParameterReadingAction
F135-PW-100EGT margin+38°CWithin limits
APG-81T/R module BIT2 deg modulesSchedule depot inspect
EOTSWindow degradeNegligibleNominal
AN/ASQ-239EW receiverNominal
◤ LESSONS LEARNED
  1. LL-01Tighten EMCON BRAVO brief: confirm Link-16 TX inhibit prior to push.
  2. LL-02SDB #2 INS drift — request batch trace from depot; cross-check ALIS PHM trend.
  3. LL-03A/R offload tracking matched plan within 1.4% — retain SHELL-71 anchor for Day-2.
  4. LL-04Recommend BDA re-attack on Big Bird rdr with GBU-31 if released in next ATO.