Engineering Change Requests & CCB

ECR/ECP intake, impact analysis, and Configuration Control Board (CCB) decision tracking. Class-I changes affect form/fit/function/interface and require government CCB; Class-II are contractor-internal.

Workflow

ECR State Machine

⟦ SysML Snippet — Submitted → Impact → CCB → Approved → Implementing → Verified → Closed (or Rejected)
Tracker

Active Change Requests

ECRTITLECLASSPRISTATEIMPACT (CI / RTM)COSTSCHED
ECR-3014Add SDB-II loadout station 4 outboard
orig: Weapons IPT
Class IIRoutineCCB$1.2M+6wk
ECR-3027MADL key rollover — leap-second handling
orig: Crypto IPT
Class IUrgentImplementing$280k+2wk
ECR-3031Coalition partner-X releasability filter
orig: FMS Office
Class IIRoutineImpact Analysis$640k+8wk
ECR-3038Threat library schema v3 — polarization field
orig: EW IPT
Class IRoutineApproved$95k+3wk
ECR-3041DTC sanitize-on-offload multi-pass
orig: ISSE
Class IUrgentVerified$48k+1wk
ECR-3045ICP bezel firmware NVM wear-leveling
orig: Avionics IPT
Class IIRoutineSubmitted$22k+2wk
ECR-2998Operator manual reflow for Blk4 OFP
orig: Tech Pubs
Class IIRoutineClosed$15k
Reference

Change classes (per MIL-STD-973 / EIA-649)

⟦ Class I ⟧

Affects form, fit, function, interface, safety, reliability, weight, or contractual cost/schedule. Requires government CCB approval.

⟦ Class II ⟧

Editorial or minor design changes that do NOT affect Class-I attributes. Approved by the contractor CCB, with government concurrence.